We are trying to get an idea on how long we should schedule for the upgrade. These are the versions we have and we will be upgrading to the latest versions. In your experience, how long do you think the upgrades above (NPM/Core, SAM, IPAM, NCM, UDT) will take in total?
NPM 10.4.2 => 10.6.1
Orion Core 2012.2.2 => 2013.2.X
SAM 5.5.0 => 6.0.2
IPAM 3.1.1 => 4.0.0 or 4.1.0
NCM 7.0 => 7.2.2
NTA 3.11.0 => Upgrade at later date
WPM 2.0.1 => Current Version
UDT 2.5.1 => 3.0.2
IVIM 1.5.0 => ???? (Can't find current version)
Thanks!